As our new campus development takes shape, we will be sharing regular updates on the construction of the building and the installation of our new facilities.

Site Progress Status – Base Build

  • Structure, completed
  • Blockwork, in progress on Level 6
  • Plaster, in progress from G/Floor to Level 2
  • External Façade, G/Floor to Level 3 installation of Aluminium profiles
  • Façade Glazing, reached Level 2
  • MEP services, in progress G/Floor to Level 5
  • Roof level, MEP equipment to be installed.
  • Finishes, incl. tiling, paint, ceilings to commence

Site Photos

Building A

Building A – External View from South Side

Building A

Building A – External View from South Side, Roundabout

Building A

Building A – External View from South Side

Building A

Building A – External View from South Side, Roundabout

 
G/Floor – North Side, Civil Lab

G/Floor – North Side, Civil Lab

G/Floor – South Side, Façade Glazing in Progress

G/Floor – South Side, Recruitment Lounge

 
G/Floor – South Side, Façade Glazing in Progress

G/Floor – South Side, Façade Glazing in Progress

1st Floor – North Side, Teaching Spaces, MEP Services in Progress

1st Floor – North Side, Teaching Spaces, MEP Services in Progress

 
1st Floor – North Side, Student Lounge Area, MEP Services and Façade Glazing in Progress

1st Floor – North Side, Student Lounge Area, MEP Services and Façade Glazing in Progress

4th Floor – South Side, Teaching Spaces, MEP Services in Progress

4th Floor – South Side, Teaching Spaces, MEP Services in Progress

 
6th Floor – Blockwork in Progress for Toilet Areas

6th Floor – Blockwork in Progress for Toilet Areas

Roof – Casting of Plinths and Waterproofing for MEP Equipment Installations to Commence

Roof – Casting of Plinths and Waterproofing for MEP Equipment Installations to Commence